95 Express Phase 3

Broward at 95 PD&E Study click here for information


The Florida Department of Transportation (FDOT) is implementing Phase 3 of the 95 Express Lanes continuing 29 miles north from Stirling Rd. in Broward County to Linton Blvd. in Palm Beach County. The purpose of the 95 Express Lanes is to improve mobility, relieve congestion, provide additional travel options, enhance transit services, accommodate future growth and development in the region, enhance emergency evacuation, and improve system connectivity between key limited access facilities in South Florida. 95 Express is part of a regional network of express lanes that will provide a safe, efficient, and reliable transportation alternative to drivers traveling throughout South Florida.

The Phase 3 project limits were evaluated as three individual Project Development and Environment (PD&E) studies. The studies were conducted from Stirling Rd. to Oakland Park Blvd. in Broward County; from Oakland Park Blvd. in Broward County to Glades Rd. in Palm Beach County; and from Glades Rd. to Linton Blvd. in Palm Beach County. In order to expedite the construction of the 95 express lanes in Southeast Florida, FDOT combined the results of all three studies into Phase 3.The improvements in Phase 3 will be implemented in segments due to funding limitations. The first segment (3A-1 from south of Broward Blvd. to north of Commercial Blvd., and 3A-2 north of Commercial Blvd. to SW 10th St. in Broward County) is under construction. The second segment (3B-1 from south of SW 10th St. to south of Glades Rd.) is anticipated to begin construction in 2018. The third segment (3B-2 south of Glades Rd. to Linton Blvd.) is scheduled for construction in 2020. A key component of Phase 3 is a potential direct connection between northbound and southbound 95 Express and I-595, to and from the west. This direct connect will be included in the Phase 3C limits of 95 Express Phase 3. Segment 3C is the fourth segment with limits from Stirling Road to south of Broward Blvd on I-95 and along I-595 from SR 7/US 441/Turnpike Interchange to I-95.  Phase 3C will begin construction in 2019. Additionally, a continuation of Ramp Signaling will be included as part of this project up to Linton Blvd. in Palm Beach County.

Firms interested in 95 Express Phase 3C can obtain a project CD by contacting Stacy-Ann Brown, District 4 Procurement Services Office, at stacy.brown@dot.state.fl.us

 


 

Please click here to download the Project Fact Sheet

 

PROPOSED IMPROVEMENTS & CONCEPTS
File Name Date Added / Updated Format Link
I-95 Express Phase 3 Typical Sections 8/15/2014 PDF Download
Phase 3C North Improvements 3/2/2017 PDF Download
Phase 3C South Improvements 3/2/2017 PDF Download
Phase 3C 595 Improvements 3/2/2017 PDF Download
Phase 3 Ingress and Egress Points 3/2/2017 PDF Download
 
RESOURCES
File Name Date Added / Updated Format Link
Fact Sheet Detailed 2016-09-14 3 Pages 2/15/2017 PDF Download
Fact Sheet Express Lanes Benefits 2016-10-21 11/3/2016 PDF Download
Ramp Signaling Informational Fact Sheet 4/2/2014 PDF Download
Ramp Signaling Frequently Asked Questions 4/2/2014 PDF Download
Ramp Signaling Informational Brochure 4/2/2014 PDF Download
 
PRESENTATIONS and MEETINGS
File Name Date Added / Updated Format Link
I-95 Express Phase 3C Industry Forum Presentation 4/25/2017 PDF Download
I-95 Express Phase 3 C Industry Forum Registration List 4/25/2017 PDF Download
I-95 Express Ph3B Public Workshop Presentation 2016-10-27 11/3/2016 PDF Download
95 Phase 3B Summary of Project 2016-10-27 Public Workshop 11/3/2016 PDF Download
95X3B Express Lanes Entrance Exits 11/3/2016 PDF Download
Roadway Typical Section 95X3B 11/3/2016 PDF Download
Roll Plot 953B Clint Moore Public Workshop 2016-10-27 11/3/2016 PDF Download
I-95 Express Phase 3B-1 Industry Forum Summary 6/14/2016 PDF Download
I-95 Express Phase 3B-1 Industry Forum Presentation 5/17/2016 PDF Download
I-95 Express Phase 3B-1 Industry Forum attendees list 5/17/2016 PDF Download
I-95 Express Phase 3A Industry Forum Attendees List 7/24/2014 PDF Download
I-95 Express Phase 3A Industry Forum Presentation 7/18/2014 PDF Download
I-95 Express Phase 3A Public Workshop Presentation 6/16/2014 Video Watch Video
October 2013 DBIA Presentation 2/11/2014 Video Watch Video
 
OTHER RELATED DOCUMENTS
File Name Date Added / Updated Format Link
South Florida Regional Express Lanes Network Project Status Map 6/16/2014 Video Download
 
PROJECT DEVELOPMENT & ENVIRONMENT (PD&E)
File Name Date Added / Updated Format Link
Phase 3C Re-evaluation 6/14/2016 PDF Download
Central PD&E Noise Study Report - File size 35MB 10/20/2014 PDF Download
Signed PDSR (Type2 Cat. Ex.) for North PD&E - File size 46 MB 2/11/2014 PDF Download
Signed Type 2 Cat. Ex. for Central PD&E - File size 153 MB 2/11/2014 PDF Download
Signed Type 2 Cat. Ex. for South PD&E - File size 31 MB 2/11/2014 PDF Download
Design Change Reevaluation for North PD&E 2/11/2014 PDF Download
North PD&E Preliminary Engineering Report (Glades Rd. to Linton Blvd.) 2/11/2014 PDF Download
Central PD&E Preliminary Engineering Report (1 of 3) (Oakland Park to Glades Rd.) 8/13/2014 PDF Download
Central PD&E Preliminary Engineering Report (2 of 3) 2/11/2014 PDF Download
Central PD&E Preliminary Engineering Report (3 of 3) 2/11/2014 PDF Download
South PD&E Preliminary Engineering Report (Stirling Rd. to Oakland Park) 2/11/2014 PDF Download